Procedure
A detailed procedure was adopted in July 2011 by the U of A Construction Procurement Coordinating Council which applies to all university-owned buildings and renovations, regardless of funding source or construction management/delivery method used. Review the Construction and Renovation Permitting Procedure.
Request Construction Permits
- General Construction
- Fire Sprinklers
- Fire Alarms
- Demolition
- Hood Suppression System
- Foundation
- Above Ground Storage Tank
- Temp Electric
- Underground Fire Line
Request Inspections
- Fire Line Underground
- Fire Line Flush
- Overhead Hydrostatic Test
- Overhead Layout/Pre-Ceiling Inspection
- Fire Alarm Test
- Life Safety
Submit Additional Files
Use this option to submit additional files related to an existing permit.
Permit Extensions
A Permit Extension Request allows users to extend their existing permits if work is delayed beyond the standard 180-day period as outlined in the 2024 IBC Code [A] 105.5. All extensions must be requested with a minimum of 48 hours prior to need of permit. We do not accept same day or overnight requests.
Building Code Amendments
2018 Amendments to the International Codes:
- International Building Code 2018 Edition
- International Existing Building Code 2018 Edition
- International Fire Code 2018 Edition
- International Fuel Gas Code 2018 Edition
- International Mechanical Code 2018 Edition
- International Plumbing Code 2018 Edition
- International Residential Code 2018 Edition
- National Electrical Code 2017 Edition